Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›KHI Delivers Gas Engines for Singapore LNG Terminal
Project & Tenders

December 14, 2012 · about 13 years ago

KHI Delivers Gas Engines for Singapore LNG Terminal

Kawasaki Heavy Industries announced that it has completed the delivery of two Kawasaki Green Gas Engines for the first LNG terminal in Singapore. The two Kawasaki Green Gas Engines feature an electrical output of 7,800 kW and the world’s highest electrical efficiency of 49.0%. Kawasaki received the

1 minutes read
  • LinkedIn
  • X
  • Email

Kawasaki Heavy Industries announced that it has completed the delivery of two Kawasaki Green Gas Engines for the first LNG terminal in Singapore.

The two Kawasaki Green Gas Engines feature an electrical output of 7,800 kW and the world’s highest electrical efficiency of 49.0%. Kawasaki received the order for the engines in December 2011 from EUROASIATIC MACHINERY, which is the Engineering, Procurement and Commissioning contractor for the Gas Engine Generator Project in the Singapore terminal.

These engines are the first to be supplied outside Japan. The electricity generated by these gas engines will be for captive use at the LNG terminal.

Following installation and commissioning by EUROASIATIC MACHINERY, the gas engines will be handed over to the terminal operator, Singapore LNG Corporation.

Singapore has decided to import LNG with a view to diversifying its energy supply sources to enhance its energy security. The country is now building an LNG terminal on Jurong Island, located to the southwest of Singapore’s mainland. The LNG terminal will have an initial throughput capacity of 3.5 million tonnes per annum (Mtpa) when it enters into operation in the second quarter of 2013. In the end, the terminal will have an annual capacity of over 6 million tonnes.

[mappress] LNG World News Staff, December 14, 2012; Image: SLNG

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

20 days ago