Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Russia: Hotchya Marine to Design Large Fish Stock Research Vessel
Shipbuilding

February 18, 2013 · about 13 years ago

Russia: Hotchya Marine to Design Large Fish Stock Research Vessel

Hotchya Marine Design signed a contract with the Ministry of Industry and Trade for the development of the initial design requirements and the conceptual design of Mezhdunarodny, a large research vessel intended for fish stock assessment research in the global ocean. In accordance with the design re

2 minutes read
  • LinkedIn
  • X
  • Email

Hotchya Marine Design signed a contract with the Ministry of Industry and Trade for the development of the initial design requirements and the conceptual design of Mezhdunarodny, a large research vessel intended for fish stock assessment research in the global ocean.

In accordance with the design requirement, the research vessel will have 12-15 laboratories with the total area of about 250 m² aboard. A fish hold with the capacity of at least 500 m³ will be provided (maintaining the temperature of -28 °С to -30 °С), as well as deep freezers with the capacity of at least 15 tons per day.

To ensure efficient solution of the research tasks, the vessel will have a DYNPOS-1 dynamic positioning system to maintain the vessel’s position during the research operations. The vessel speed at full-load displacement and the rated power of the main propulsion unit will be 15 knots while free-running, and 6 knots while trawling.

The vessel’s navigable properties and equipment will ensure research operations at sea state 5 and force 6 wind, towing of geophysical equipment at sea state 6 and force 7 wind. The research vessel will operate in the unlimited area.

There are about 60 crew and science team members.

There will be cranes, as well as trawl, ocean, and hydrobiology survey winches on the decks.

The project will follow the “Conceptual Marine Equipment Designs” (“New Look”) line within the framework of the “Civil marine facilities development for 2009-2016” federal special-purpose program.

[mappress]

Hotchya Marine Design, February 18, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free