Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Lithuania: Klaipedos Nafta Selects Supplier for LNG Construction Works
Project & Tenders

March 1, 2013 · about 13 years ago

Lithuania: Klaipedos Nafta Selects Supplier for LNG Construction Works

AB Klaipėdos Nafta said it has selected akciju sabiedriba (AS) BMGS as the supplier for engineering and construction works of port infrastructure (jetty) with suprastructure (equipment) of liquefied natural gas terminal. During the implementation of the tender of AB Klaipėdos Nafta “Procurement of E

2 minutes read
  • LinkedIn
  • X
  • Email

AB Klaipėdos Nafta said it has selected akciju sabiedriba (AS) BMGS as the supplier for engineering and construction works of port infrastructure (jetty) with suprastructure (equipment) of liquefied natural gas terminal.

During the implementation of the tender of AB Klaipėdos Nafta “Procurement of Engineering and Construction Works of Port Infrastructure (Jetty) with Suprastructure (Equipment) of Liquefied Natural Gas Terminal” 3 final tender offers were submitted by 18 February 2013. Upon evaluation of the final tender offers according to the lowest price criterion, AS BMGS, which undertook to carry out all works for the total amount of 27.19 EUR (93.88 mln. LTL) excluding VAT, was recognised to be the winner, Klaipedos nafta said in a statement.

AB Klaipėdos Nafta sent an invitation to company AS BMGS to conclude a public procurement contract which must be signed after the period of deferment of 15 days which is applicable to the conclusion of the public procurement contract.

The contract between AB Klaipėdos Nafta and AS BMGS for procurement of engineering and construction works of port infrastructure (jetty) with suprastructure (equipment) of liquefied natural gas terminal will enter into full force only if the Board and the general meeting of shareholders of AB Klaipėdos Nafta approve of the conclusion of the contract.

In accordance with the bilateral agreement between AB Klaipėdos Nafta and Klaipeda State Seaport Authority on the improvement and creation of Port Infrastructure / Suprastructure, part of the costs of the contract shall be reimbursed by Klaipeda State Seaport Authority (all costs for the Klaipeda State Seaport Infrastructure and part of the common work costs). Klaipeda State Seaport Authority shall reimburse to AB Klaipedos Nafta the amount of 14.20 mln. EUR (49.02 mln. LTL) excluding VAT. AB Klaipedos Nafta shall bear the costs for the amount of 12.99 EUR (44.86 mln. LTL) excluding VAT.

[mappress] LNG World News Staff, March 01, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago