Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›BMGS to Build Jetty for Lithuania LNG Terminal
Project & Tenders

March 20, 2013 · about 13 years ago

BMGS to Build Jetty for Lithuania LNG Terminal

Klaipedos Nafta of Lithuania said it has selected BMGS for the construction of a jetty at the liquefied natural gas terminal, the company revealed in a statement. “On 18 March 2013 Klaipėdos Nafta concluded the Contract for Engineering and Construction Works of Port Infrastructure with Suprastructur

1 minutes read
  • LinkedIn
  • X
  • Email

Klaipedos Nafta of Lithuania said it has selected BMGS for the construction of a jetty at the liquefied natural gas terminal, the company revealed in a statement.

“ On 18 March 2013 Klaipėdos Nafta concluded the Contract for Engineering and Construction Works of Port Infrastructure with Suprastructure with the winner of the international tender “Procurement of Engineering and Construction Works of Port Infrastructure (Jetty) with Suprastructure (Equipment) of Liquefied Natural Gas Terminal” with “BMGS” regarding engineering and construction works of port infrastructure with suprastructure of liquefied natural gas terminal, ” Klaipedos Nafta stated.

The main conditions of the Contract inter alia include the following:

(i) The total fixed price for all the works under the Contract shall not exceed 27 190 000 EUR (twenty seven million one hundred ninety thousand euro) without VAT (93 881 632 LTL without VAT). This fixed price can increase only in the exclusive cases provided for in the Contract. AB Klaipėdos nafta shall be paying the indicated fixed sum only for the actual works performed under the Contract.

(ii) All the works under the Contract shall be finished till 1 October 2014. The performance terms may only be extended in the exclusive cases set forth in the Contract.

[mappress] LNG World News Staff, March 20, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago