Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Yokogawa to Supply Automation and Safety System for Sabine Pass LNG (USA)
Equipment

March 29, 2013 · about 13 years ago

Yokogawa to Supply Automation and Safety System for Sabine Pass LNG (USA)

Yokogawa Electric Corporation said that it has been selected to supply the integrated automation and safety system for the new liquefaction trains at Cheniere’s LNG facility in Sabine Pass, LA, which is being developed by its subsidiary Sabine Pass Liquefaction, LLC (SPL). SPL is the first company w

2 minutes read
  • LinkedIn
  • X
  • Email

Yokogawa Electric Corporation said that it has been selected to supply the integrated automation and safety system for the new liquefaction trains at Cheniere’s LNG facility in Sabine Pass, LA, which is being developed by its subsidiary Sabine Pass Liquefaction, LLC (SPL).

SPL is the first company with Department of Energy approval to export liquefied natural gas (LNG) to non-Free Trade Agreement countries. The development of liquefaction services at the Sabine Pass LNG receiving terminal in Cameron Parish, LA will transform the terminal into a bi-directional facility capable of liquefying and exporting natural gas and importing and re-gasifying foreign-sourced LNG.

“We are proud to be part of this groundbreaking liquefaction project in the U.S.,” says Chet Mroz, President and CEO of Yokogawa Corporation of America. “Yokogawa has a 25 percent worldwide market share for LNG plants as well as a long-standing relationship with Cheniere Energy, beginning with the purchase of Yokogawa’s CENTUM® CS 3000 control system for the original gasification facility at Sabine Pass in 2006.”

Yokogawa’s CENTUM VP integrated production control system was selected for the new liquefaction facility. While CENTUM VP is classified as a distributed control system (DCS), it goes beyond a traditional DCS by offering a more intuitive human machine interface and a large-capacity field control station to process data faster while maintaining exceedingly high reliability. The dual-redundant configuration of processor cards combined with pairing each processor card with two CPUs (pair & spare configuration) ensures uninterrupted operations and high availability.

SPL will also utilize the ProSafe®-RS integrated safety instrumented system (SIS) from Yokogawa for the site. ProSafe-RS delivers the world’s first completely integrated SIS for DCS to simplify deployment, operation, and maintenance. Until now, two separate monitoring and operating environments were required for the DCS and SIS. ProSafe-RS eliminates the need to implement separate communications and distinctive hardware architectures for the DCS and SIS, thus fast tracking implementation at Sabine Pass, lowering overall costs, and simplifying operation and maintenance.

[mappress] LNG World News Staff, March 29, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

21 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

21 days ago