Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Excelerate Energy Starts Preparation Works for Ukrainian LNG Terminal
Project & Tenders

April 24, 2013 · about 13 years ago

Excelerate Energy Starts Preparation Works for Ukrainian LNG Terminal

Excelerate Energy LLC launches a preparation of engineering works for LNG Terminal National Project. The service agreement was signed on April 16, 2013 in Houston (US) between the “LNG Terminal National Project” State-owned Enterprise and Excelerate Energy LLC, a global market leader of FSRU. “The U

2 minutes read
  • LinkedIn
  • X
  • Email

Excelerate Energy LLC launches a preparation of engineering works for LNG Terminal National Project.

The service agreement was signed on April 16, 2013 in Houston (US) between the “LNG Terminal National Project” State-owned Enterprise and Excelerate Energy LLC, a global market leader of FSRU.

“The US company Excelerate Energy launches engineering works on installation of a floating storage and regasification unit on the Black Sea coast in Ukraine (Yuzhny port). This came to happen due to the contract signed on 17th of April 2013, between the “LNG Terminal National Project” State-owned Enterprise and Excelerate Energy LLC” – said Mr. Kaskiv, the Head of the State Agency for Investment and National Projects of Ukraine , during the International Conference LNG-17, being held in Houston, US.

The Agreement appeared as a next step after signing the Framework Agreement on cooperation on November 26, 2012 during a formal ceremony of launching the construction of LNG terminal.

The LNG Terminal National Project expects the results of the work will make it possible within the next year to install a floating storage and regasification unit (FSRU) in Yuzhny Port near Odessa with a total capacity of 5 bcm.

Besides, as previously reported, the representatives of Baker Botts law company, specializing in energy sphere, provided a legal opinion on the possibility of unrestricted gas transportation through the Straits of Bosporus and Dardanelles, while the Polish Office of ILF International Company will ensure the pre-project and research works during the development of the first stage of engineering of the ground part of the terminal.

[mappress] LNG World News Staff, April 24, 2013; Image: ukrproject.gov.ua

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago