Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›SENER Secures Zeebrugge LNG Terminal Contract Extension, Belgium
Project & Tenders

April 25, 2013 · about 13 years ago

SENER Secures Zeebrugge LNG Terminal Contract Extension, Belgium

Fluxys LNG N.V./ S.A. has awarded to the engineering and construction group SENER a turnkey project for the extension of the liquefied natural gas (LNG) terminal in the Zeebrugge Port, 20 km away from Brugge (Belgium). SENER will carry out this project as part of the TS LNG joint venture, formed by

2 minutes read
  • LinkedIn
  • X
  • Email

Fluxys LNG N.V./ S.A. has awarded to the engineering and construction group SENER a turnkey project for the extension of the liquefied natural gas (LNG) terminal in the Zeebrugge Port, 20 km away from Brugge (Belgium).

SENER will carry out this project as part of the TS LNG joint venture, formed by SENER and Techint.

Representatives from Fluxys LNG, SENER and Techint signed the contract last April 18th at Fluxys LNG offices in Brussels.

The extension works will consist of adding a second jetty, enabling the facility to increase capacity and further develop into a hub for supplying LNG as fuel for ships and long-haul trucks. Once the construction works are over in mid-2015, the terminal will have an additional LNG loading/unloading capacity of 14,000 m3/hour.

Within the joint venture, SENER will carry out all plant engineering activities, being also in charge for project management, procurement and construction, as well as for construction and commissioning management.

SENER, through its engineering and construction activity, specializes in turnkey projects in LNG plants, a sector in which it has carried out numerous projects both in Spain, Europe and Latin America.

SENER has carried out some of these projects as part of the TS LNG company, a joint venture between SENER and Techint that develops EPC contracts in the LNG sector. To date, TS LNG has been responsible for outstanding projects such as Gate terminal, in the Netherlands – an international reference in the regasification plants industry – and the Dunkirk terminal, in France.

[mappress] LNG World News Staff, April 25, 2013; Image: Port of Zeebrugge

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

22 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

22 days ago