Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›SAACKE Wins Gas Combustion Order for Six LNG Tankers, China
Equipment

July 12, 2013 · about 13 years ago

SAACKE Wins Gas Combustion Order for Six LNG Tankers, China

Bremen’s SAACKE GmbH has been commissioned to produce and deliver gas combustion units (GCU) for six LNG tankers. The customer is Hudong-Zhonghua Shipbuilding (Group) Co., Ltd., one of the largest shipyards worldwide, and the later common ship owners are China Shipping LNG Investment Co., Ltd., SINO

2 minutes read
  • LinkedIn
  • X
  • Email

Bremen’s SAACKE GmbH has been commissioned to produce and deliver gas combustion units (GCU) for six LNG tankers. The customer is Hudong-Zhonghua Shipbuilding (Group) Co., Ltd., one of the largest shipyards worldwide, and the later common ship owners are China Shipping LNG Investment Co., Ltd., SINOPEC and MOL.

Delivery of the GCUs with a system capacity of 5.2 tons of gas per hour is to occur in 2014. The first ship will be completed at the end of 2015. Gas combustion units enable the safe sea transport of liquefied natural gas by handling the excess boil-off gas completely and with maximum availability.

This is already the second ship series in which Hudong-Zhonghua has had recourse to SAACKE’s know-how, but the first order in which GCUs will achieve 100 per cent of their performance under free flow conditions.

Andreas von Minden, Sales Manager Offshore Applications at SAACKE explains: “ Normally, excess boil-off gas is supplied to the consumers via a compressor and at three to four bar pressure. Gas no longer needed for the ship’s engines is burned off via the GCU. But there is a great risk of compressor failure and of safety risks arising due to increasing tank pressure .” In SAACKE’s 100 per cent free flow solution, the boil-off gas is completely burned without using a compressor and already at a pressure of 0.15 bar – much lower and as a result safer than in other systems. “ This was also the main reason the client decided on our gas combustion unit ”, according to von Minden.

Compact design and increased system availability

The GCU combines a low emission swirl burner of the SAACKE SSB series with an air-cooled steel combustion chamber. All of the components have been so compactly designed that the 12 meter high, 36-ton system can be accommodated in the area of the funnel and saves valuable construction space in the ship. The pre- and post-combustion chambers will be manufactured in Bremen. The outer casing will be produced at the Chinese SAACKE location. The SAACKE GCU has some additional features which increase the availability of the system. Even when the sea is rough, there is no contact between the flame and combustion chamber walls and the inner parts are rain sealed also during heavy rain.

[mappress]

LNG World News Staff, July 12, 2013; Image: SAACKE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

23 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

23 days ago