Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Carbon Trust Requires Consultancy Services to Study OW Gravity Base Structures (UK)
Offshore Wind

September 3, 2013 · about 13 years ago

Carbon Trust Requires Consultancy Services to Study OW Gravity Base Structures (UK)

The Carbon Trust is looking for an offshore wind farm consultancy services to study which gravity base structures could reduce offshore wind cost more, lifted or floated. Gravity Base Structures (GBS), in terms of potential cost reduction, have very promising foundations concepts for wind turbine ge

2 minutes read
  • LinkedIn
  • X
  • Email

The Carbon Trust is looking for an offshore wind farm consultancy services to study which gravity base structures could reduce offshore wind cost more, lifted or floated.

Gravity Base Structures (GBS), in terms of potential cost reduction, have very promising foundations concepts for wind turbine generation in deeper water sites competing against steel jacket structures for large offshore wind farms.

Within the GBS family, two major types of gravity foundations can be differentiated: Float-out-and-sink concepts (“Floated concepts”). These types of GBS are made with high concrete volumes (usually cone-shaped) leading to a buoyant element during transport. They only require tugboats to transport them from the construction site to the offshore wind site. There they are lowered to the seabed by ballasting the inside of the structure with water. Once they have settled down at the sea bed the structure is usually ballasted with sand to provide higher final stability.

Lifted concepts: These types of GBS are optimised in terms of concrete volume for its final operational requirements (not also transportation requirements). In order to transport and deploy this structures form the construction site to the offshore wind site a transportation vessel / heavy lift crane or barge is required. This auxiliary mean can be one single element or a combination of different elements such as a barges and a heavy lift crane.

The Foundations Technical Working Group of the OWA has performed a Concrete Benchmarking Study with the aim of down-selecting the most promising concepts. This study has shown that there is a differentiation between the overall costs of Floated concepts against Lifted concepts.

A more detailed study is required analysing the cost assumptions of both the manufacturing/construction and the marine operations (transport and lowering/ballasting).

[mappress]

Offshore WIND Staff, September 3, 2013; Image: deltares

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free