Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)
Technology

September 24, 2013 · about 13 years ago

Installation of First AREVA Turbines Starts at Trianel and Global Tech I (Germany)

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea. By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megaw

1 minutes read
  • LinkedIn
  • X
  • Email

The installation phase of the first AREVA M5000 turbines has begun for the German offshore wind farm Global Tech I and Trianel Windpark Borkum in the North Sea.

By 2014, these two parks will host 120 turbines (40 at Trianel Windpark Borkum, 80 at Global Tech I) for an installed capacity of 600 megawatts, providing electricity to around 600,000 households. AREVA’s technology will represent at that point, 33% of the 1800 MW of Germany’s offshore wind installed base.

The Trianel Windpark Borkum, with a 200 MW capacity, is located nearly 45 kilometers off the island of Borkum, near the alpha ventus park where six AREVA turbines have been in operation since 2009. The Global Tech 1 park, with a 400 MW capacity, is located at a distance of 110 kilometers from the German coast, which will constitute a world first.

Louis-Francois Durret, Senior Executive Vice-President of AREVA’s Renewable Energies Business Group , said: “By giving us their confidence, our customers Trianel and Global Tech I, have enabled us to reinforce our key player position on the European offshore wind market and positions us favourably to win future contracts in France and the United Kingdom.”

[mappress]

Press release, September 24, 2013; Image: Areva

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

17 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

17 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

19 days ago