Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Energy Transfer, BG to Develop Trunkline LNG Export Project (USA)
Project & Tenders

October 2, 2013 · about 13 years ago

Energy Transfer, BG to Develop Trunkline LNG Export Project (USA)

Energy Transfer Equity and Energy Transfer Partners and BG Group announced that they have entered into a project development agreement (PDA) to jointly develop the liquefied natural gas (LNG) export project at the existing Trunkline LNG import terminal in Lake Charles, Louisiana. The announcement fo

2 minutes read
  • LinkedIn
  • X
  • Email

Energy Transfer Equity and Energy Transfer Partners and BG Group announced that they have entered into a project development agreement (PDA) to jointly develop the liquefied natural gas (LNG) export project at the existing Trunkline LNG import terminal in Lake Charles, Louisiana.

The announcement follows the Department of Energy conditionally granting authorization to Energy Transfer and BG Group to export from the existing Trunkline LNG import terminal up to 15 million metric tonnes per annum (mtpa) of LNG to non-free trade agreement nations.

The proposed project will include the construction of three liquefaction trains and will use the existing LNG storage and marine berthing facilities owned by Trunkline LNG Company (a wholly-owned subsidiary of Energy Transfer). Energy Transfer has secured all property rights required for the site of the liquefaction facility.

The project is being developed to liquefy domestic supplies of natural gas for export to meet growing global demand for LNG. Exporting LNG to world markets is expected to provide economic and employment related benefits for the U.S., including approximately 250 operational positions and several thousand jobs during the project’s construction phase.

The PDA sets forth the commercial arrangements between the parties and a final investment decision to proceed with the project is expected to be made in 2015.

Energy Transfer will own and finance the proposed new liquefaction facility, and BG Group will have a long-term tolling agreement with Energy Transfer for the offtake, although BG Group may choose to assign some of its capacity or offtake to third parties. Trunkline Gas Company, LLC (a wholly-owned subsidiary of Energy Transfer), will provide pipeline transportation services to supply natural gas to the project.

BG Group views Lake Charles as an attractive, low cost LNG supply option and is one of the most advanced LNG development projects in its portfolio. BG Group will oversee the engineering and design and will manage construction of the facility, as well as operate the combined facility. The project’s front end engineering and design (FEED) study being done by Technip is well advanced. The project is in the Federal Energy Regulatory Commission’s (FERC) “pre-filing” environmental review process, with the parties currently expecting to file a formal application with the FERC by the end of the first quarter of 2014.

Pending final investment decisions from both Energy Transfer and BG Group, construction is expected to start in 2015, with first LNG exports anticipated in 2019.

[mappress] LNG World News Staff, October 02, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

24 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

24 days ago