Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Prelude FLNG: Two Hull Sections Join Together (VIDEO)
FPSO

October 21, 2013 · about 13 years ago

Prelude FLNG: Two Hull Sections Join Together (VIDEO)

It’s the moment of truth for the world’s first floating liquefied natural gas facility in Geoje, South Korea. After months of construction the Prelude team faces its greatest challenge yet. The two giant sections of the hull are complete; now they must join together. It’s an operation that has been

1 minutes read
  • LinkedIn
  • X
  • Email

It’s the moment of truth for the world’s first floating liquefied natural gas facility in Geoje, South Korea.

After months of construction the Prelude team faces its greatest challenge yet. The two giant sections of the hull are complete; now they must join together. It’s an operation that has been years in the planning. Join the team as they shift over 100,000 tonnes of steel to make it happen.

This content is available after accepting the cookies.

Once complete, the 600,000 tonnes facility will be almost half a kilometre in length (488 metres or 1,601 feet), which is longer than four soccer fields, and will displace six times as much water as the largest aircraft carrier. It will be moored and hooked up to the undersea infrastructure, around 475 kilometres north-east of Broome, Western Australia.

Despite its huge dimensions, the facility is only one-quarter the size of an equivalent plant on land. Shell’s technology has been adapted for floating LNG, and engineers designed components that will stack vertically to save space. The cooling plant, for example, will be placed above the vast storage tanks that have a capacity equivalent to around 175 Olympic swimming pools. Specially designed tubes, known as risers, will draw 50 million litres of cold water from the ocean every hour to help cool the natural gas.

[mappress] October 21, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOBusiness & FinanceInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free