Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Infrastructure

Loading filters...
Business & FinanceBusiness Developments & ProjectsOutlook & StrategyProject & TendersTransitionVisionAuthorities & GovernmentRegulation & PolicyCollaborationMarket OutlooksCarbon Capture Usage & StorageInnovation
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Infrastructure

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

Following the completion of pre-engineering studies (pre-FEED), the BarMar hydrogen pipeline project, which will connect Spain and France, is entering the front-end engineering design (FEED) phase, set to confirm the technical viability and final design of the subsea infrastructure. BarMar is a 400-

10 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Infrastructure

Underground drilling marks start of offshore section works for second Malta-Italy link

Nexans has begun horizontal directional drilling (HDD) works in Malta for the second electrical interconnector to Italy, marking the start of work related to the project’s offshore section. This will create the underground connection between the onshore and offshore sections of the project, allowing

11 days ago
‘UK’s largest-ever’ electricity transmission project in major construction phase
Infrastructure

‘UK’s largest-ever’ electricity transmission project in major construction phase

Eastern Green Link 2 (EGL2), a subsea link said to be the UK’s largest-ever electricity transmission project and the longest high-voltage direct current (HVDC) cable in the country, has entered the major construction phase, with detailed marine engineering surveys progressing along the offshore cabl

12 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Infrastructure

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

Government-linked Singapore Energy Interconnections (SGEI) and Danantara Indonesia, through its investment arm Danantara Investment Management (DIM), have signed a memorandum of understanding (MoU) for the development of cross-border electricity interconnections between Indonesia and Singapore. The

12 days ago
NextGeo starts marine surveys for Italy’s electricity connection
Infrastructure

NextGeo starts marine surveys for Italy’s electricity connection

Italy-headquartered Next Geosolutions (NextGeo) has commenced marine surveys for the new Milano-Montalto electricity connection, a strategic infrastructure project aimed at strengthening Italy’s national grid. The activities will cover the seabed route between Montalto di Castro and Massa and will c

12 days ago
DeepOcean completes North Sea subsea removal campaign
Infrastructure

DeepOcean completes North Sea subsea removal campaign

DeepOcean has completed subsea removal activities at two North Sea fields operated by Spirit Energy, whose shareholders are Centrica (69%) and Stadtwerke München (31%). DeepOcean reported today, July 14, that it had completed the recovery of the remaining subsea wellhead protection structure at the

13 days ago
Aquaterra Energy and James Fisher team up to deliver simplified decommissioning
Infrastructure

Aquaterra Energy and James Fisher team up to deliver simplified decommissioning

Aquaterra Energy and James Fisher and Sons have established a decommissioning partnership to offer operators a single, integrated route to plan and execute well abandonment and infrastructure removal programs more efficiently, with fewer interfaces and greater execution certainty. Aquaterra Energy i

14 days ago
Scotland future-proofs subsea network rollout with long-term HVDC agreement
Infrastructure

Scotland future-proofs subsea network rollout with long-term HVDC agreement

Scottish transmission system operator (TSO) SSEN Transmission has signed a long-term framework agreement with Sumitomo Electric Industries and Van Oord Offshore Wind UK for the engineering, supply, transport and installation of high-voltage direct current (HVDC) subsea cable systems to support futur

17 days ago
Fugro to assist Saipem with pipeline work at UK’s first offshore CCS project
Infrastructure

Fugro to assist Saipem with pipeline work at UK’s first offshore CCS project

Dutch Fugro has been selected to deliver integrated marine survey and inspection services for Northern Endurance Partnership (NEP), the UK’s first offshore carbon capture and storage (CCS) project. Developed some 75 kilometers east of Flamborough Head, the NEP project will comprise an onshore CO2 ga

18 days ago
One landfall to go in France for first interconnector to Spain
Infrastructure

One landfall to go in France for first interconnector to Spain

Danish power cable manufacturer and installation firm NKT has completed two of the three landfalls in France for this country’s first submarine electricity interconnection to Spain. Delivered by Inelfe, a joint venture between the Spanish transmission system operator (TSO) Red Eléctrica and the Fren

19 days ago
Final phase of Cyclades interconnection project crosses finish line
Infrastructure

Final phase of Cyclades interconnection project crosses finish line

The fourth and final phase of the Cyclades interconnection project, which aims to increase the security and reliability of supply in Greece’s island systems, has been completed. Greek electricity grid operator Independent Power Transmission Operator (IPTO) reported that the construction of the South

24 days ago
UK power superhighway first HVDC cable to use 100% recycled copper
Infrastructure

UK power superhighway first HVDC cable to use 100% recycled copper

The Eastern Green Link 2 (EGL2) power superhighway in the UK is the first high-voltage direct current (HVDC) cable that will use 100% recycled copper, Prysmian, the project’s cable supplier, reported. Developed by a joint venture of SSEN Transmission and National Grid Electricity Transmission, EGL2

25 days ago
UAE’s Geosonic to inspect over 200 kilometers of pipeline in Turkmenistan
Infrastructure

UAE’s Geosonic to inspect over 200 kilometers of pipeline in Turkmenistan

UAE-headquartered offshore survey and positioning data provider Geosonic has secured an expanded scope in Turkmenistan, supporting a subsea survey and inspection program described as major. Sharjah-based Geosonic reported that it had secured a further contract in Turkmenistan supporting a program th

26 days ago
‘World’s largest’ vertical continuous vulcanization tower under construction in US
Infrastructure

‘World’s largest’ vertical continuous vulcanization tower under construction in US

LS GreenLink, the U.S. subsidiary of South Korean LS Cable & System, has started the construction of a 201-meter vertical continuous vulcanization (VCV) tower for cable insulation at its high-voltage direct current (HVDC) subsea cable factory in Virginia. The construction of the factory started in A

27 days ago
  • 1
  • 2
  • …
  • 627