Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Norwegian Getaway Leaves Building Dock at Meyer Werft (VIDEO)
Shipbuilding

November 4, 2013 · about 13 years ago

Norwegian Getaway Leaves Building Dock at Meyer Werft (VIDEO)

The float-out of the 146,600 gt cruise ship Norwegian Getaway, which is built for the US cruise operator Norwegian Cruise Line, occurred in the morning of Nov 2nd 2013. The Norwegian Getaway’s conveyance down the river Ems towards the North Sea, where she will start maiden voyage scheduled for mid-N

1 minutes read
  • LinkedIn
  • X
  • Email

The float-out of the 146,600 gt cruise ship Norwegian Getaway, which is built for the US cruise operator Norwegian Cruise Line, occurred in the morning of Nov 2nd 2013.

The Norwegian Getaway’s conveyance down the river Ems towards the North Sea, where she will start maiden voyage scheduled for mid-November 2013.

With the ship being berthed at the yard’s pier, the remaining work and tests and trials will be carried out in the next few days. Within merely a couple of days, the first crew members will move into their cabins on board, and familiarize themselves with the ship itself and its numerous systems.

The ship has a length overall of 324 m and is 39.70 m wide. Its construction complies with the latest safety standards, and the ship meets all valid environmental regulations.

Prior to the Breakaway class ships, MEYER WERFT built Norwegian’s four Jewel-class ships – Norwegian Gem delivered in 2007, Norwegian Pearl and Norwegian Jade delivered in 2006, and Norwegian Jewel delivered in 2005.

Norwegian Getaway is scheduled for delivery in mid-January 2014.

[mappress]

World Maritime News Staff, November 4, 2013; Image: MEYER WERFT

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free