Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›The Netherlands: LNG Tanker Reloaded at Gate Terminal
Vessels

November 11, 2013 · about 12 years ago

The Netherlands: LNG Tanker Reloaded at Gate Terminal

For the first time in its history a conventional sized reload has been conducted at Dutch Gate terminal. On 5 November, the “LNG Excel” moored at Gate terminal on the Maasvlakte in Rotterdam. The carrier has a capacity of 135,000 m3 liquefied natural gas (LNG) and is a so called “full sized” LNG ves

1 minutes read
  • LinkedIn
  • X
  • Email

For the first time in its history a conventional sized reload has been conducted at Dutch Gate terminal.

On 5 November, the “LNG Excel” moored at Gate terminal on the Maasvlakte in Rotterdam. The carrier has a capacity of 135,000 m3 liquefied natural gas (LNG) and is a so called “full sized” LNG vessel. The arrival of the “LNG Excel” marks that the terminal grows into a liquefied natural gas (LNG) hub.

Gasunie and Vopak, the initiators and partners in Gate terminal, originally developed this terminal as a LNG import terminal. In addition to the importing capacity, Gate terminal is now also an export terminal.

On 6 September 2013 the first small scale reload was conducted at Gate. Through Gate terminal the Netherlands now gets the ability to not only transport gas through the Dutch pipeline network, but also transport LNG as clean alternative to traditional transport fuel for shipping and road trucks.

As a first step Gate terminal completed the additional investments to facilitate their customers to berth small vessels and reload LNG in order to support the small scale market and global trading developments. A truck loading station for reloading of LNG will be ready Q1 2014. With this the start of small scale LNG for the use of LNG as fuel is a fact.

[mappress] LNG World News Staff, November 11, 2013; Image: Gate

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago
Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

18 days ago