Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›HII Floats Out Aircraft Carrier ‘Gerald R. Ford’ (USA)
Shipbuilding

November 20, 2013 · about 13 years ago

HII Floats Out Aircraft Carrier ‘Gerald R. Ford’ (USA)

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division launched Gerald R. Ford (CVN 78) into the James River for the first time on Sunday. The first-of-class aircraft carrier was moved to the shipyard’s Pier 3, where it will undergo additional outfitting and testing for the next 28

1 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division launched Gerald R. Ford (CVN 78) into the James River for the first time on Sunday. The first-of-class aircraft carrier was moved to the shipyard’s Pier 3, where it will undergo additional outfitting and testing for the next 28 months.

Gerald R. Ford has been under construction in Dry Dock 12 since November 2009 and was moved about one mile south to the shipyard’s Pier 3 with the assistance of six tugboats. The ship will be moored at Pier 3 to complete outfitting and testing. Habitability spaces, such as berthing and mess areas, will be completed, and distributive, mechanical and combat systems, such as catapults and radar arrays, will be tested. The ship is scheduled for delivery to the U.S. Navy in 2016.

“ The ship’s launch is always significant for her shipbuilders ,” said NNS Rolf Bartschi, NNS’ vice president of CVN 78 carrier construction , “ but I think it’s an extra special experience this time because of Ford’s unique qualities as the first ship of the class, and thanks to the close relationship shipbuilders have developed with CVN 78’s sponsor, Susan Ford Bales. This milestone provides an opportunity for the shipbuilding team to reflect on all of the hard work that has been accomplished to ready the ship for launch, and I could not be more proud of our shipbuilding team. ”

[mappress]

HII, November 20, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free