Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Australian Navy’s LHD Loaded onto ‘Blue Marlin’ (Spain)
Shipbuilding

December 11, 2013 · about 12 years ago

Australian Navy’s LHD Loaded onto ‘Blue Marlin’ (Spain)

NAVANTIA loaded out the Royal Australian Navy’s second Canberra Class Landing Helicopter Dock (LHD) “Adelaide” onto the “Blue Marlin” vessel of Dockwise yesterday at the Vigo inlet. The ships will remain docked at Vigo Port for a week, in order to complete the “Adelaide” bindings for securing its tr

1 minutes read
  • LinkedIn
  • X
  • Email

NAVANTIA loaded out the Royal Australian Navy’s second Canberra Class Landing Helicopter Dock (LHD) “Adelaide” onto the “Blue Marlin” vessel of Dockwise yesterday at the Vigo inlet.

The ships will remain docked at Vigo Port for a week, in order to complete the “Adelaide” bindings for securing its transport to Australia, a trip which will take about 55 days.

The “Adelaide” is the second of the two amphibious ships contracted on the 23rd of November 2007 by the Commonwealth of Australia. The Canberra Class LHDs are bigger than Australia’s last aircraft carrier HMAS Melbourne (II).

When completed, “Adelaide” will be more than 230 metres long, 27.5 metres high and weigh around 27,500 tonnes. The vessel can carry a combined armed battle group of more than 1100 personnel, 100 armoured vehicles and 12 helicopters and features a 40-bed hospital.

As it happened with the first LHD “Canberra”, “Adelaide” will be transported to BAE System Australia’s shipyards at Williamstown. When the hull arrives in Melbourne the complex task of marrying the superstructure, hull, combat system and communications system can commence.

Delivery of the “Adelaide” to the Australian Defence Force is slated for 2015.

[mappress]

World Maritime News Staff, December 11, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free