Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Darwin Port to Decommission East Arm Wharf Container Crane
Dredging

December 18, 2013 · about 12 years ago

Darwin Port to Decommission East Arm Wharf Container Crane

Following the major mechanical failure of the East Arm Wharf Container Crane on 14 October 2013, the Darwin Port Corporation reached a decision to decommission the crane following extensive engineering assessment. The repair works on the damage sustained, which would not guarantee any longevity in t

2 minutes read
  • LinkedIn
  • X
  • Email

Following the major mechanical failure of the East Arm Wharf Container Crane on 14 October 2013, the Darwin Port Corporation reached a decision to decommission the crane following extensive engineering assessment.

The repair works on the damage sustained, which would not guarantee any longevity in the crane’s capability, were considered to be uneconomic, coming in at around $3 Million. The decommissioning and removal process will be undertaken in accordance with NT Government asset disposal policy.

A new shore-based crane has been recently commissioned by Patrick Stevedores and is now available for use. The Patrick crane has similar lifting capabilities to that of the de-commissioned container crane and will provide a more efficient method of discharging vessels than the ships’ equipment that has been used since the mechanical failure.

A second mobile harbour crane is due to be available for use from mid-February 2014, commissioned by QUBE Stevedores. This crane will also have a comparable capability to the decommissioned container crane. With two shore-based cranes operating at East Arm will provide significantly improved crane capability, well beyond the capability of the decommissioned container crane.

Looking ahead, the Port Corporation will be undertaking a study into future investment in a replacement container crane. This study will cover the required capability, expected cost and delivery lead times for a replacement crane and will be used in the formulation of a business case and recommendations which will be provided to the NT Government by the end of May 2014.

[mappress]

Press Release, December 18, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free