Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Chart to Supply Fuel System for LNG Hybrid Barge, Germany
Clean Fuel

December 20, 2013 · about 12 years ago

Chart to Supply Fuel System for LNG Hybrid Barge, Germany

Chart Industries announced that Chart Ferox has been awarded a contract by Hybrid Port Energy, a subsidiary of Becker Marine Systems, to provide LNG fuel storage and processing equipment for an LNG – Hybrid Barge, which will operate in Hamburg’s HafenCity. The LNG-Hybrid Barge is a unique project be

2 minutes read
  • LinkedIn
  • X
  • Email

Chart Industries announced that Chart Ferox has been awarded a contract by Hybrid Port Energy, a subsidiary of Becker Marine Systems, to provide LNG fuel storage and processing equipment for an LNG – Hybrid Barge, which will operate in Hamburg’s HafenCity.

The LNG-Hybrid Barge is a unique project between HPE and cruise liner operators and will provide power to cruise liners – in this case AIDA cruise liners – during their layovers in the port of Hamburg using LNG to significantly reduce emissions in accordance with current and future MARPOL regulations. The ability of the cruise vessel to switch from diesel to LNG is expected to eliminate sulfur oxide (SOX) and particle emissions, lower nitrogen oxides (NOX) by up to 80%, and reduce carbon dioxide by an additional 30%.

Chart’s on-board LNG system is comprised of two 40ft LNG ISO intermodal containers and a skid mounted Gas Processing Unit (GPU), along with connecting equipment, controls, safety appliances and associated piping. LNG will be supplied in modular form using ISO containers swapped on a full-for-empty basis to eliminate the need for a dedicated bunkering station. All engineering, major capital equipment and assembly will be performed by Chart’s operations in Decin, Czech Republic. Equipment delivery and commissioning is scheduled for the second quarter of 2014 with the LNG-Hybrid Barge planned to come into operation during the third quarter of 2014.

[mappress] LNG World News Staff, December 20, 2013; Image: Chart Ferox

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelEquipmentProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free