Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›DSME Lays Keel for Petronas’ FLNG
FPSO

January 8, 2014 · about 12 years ago

DSME Lays Keel for Petronas’ FLNG

The keel laying process for PETRONAS’ first floating liquefied natural gas facility (PFLNG 1) has started this week, marking another significant milestone in the construction of the facility at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea. The first block of the

2 minutes read
  • LinkedIn
  • X
  • Email

The keel laying process for PETRONAS’ first floating liquefied natural gas facility (PFLNG 1) has started this week, marking another significant milestone in the construction of the facility at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea.

The first block of the keel, the basic structure around which the hull of the FLNG vessel will be built, was laid on 6 January in the presence of the integrated project team led by PETRONAS with its partners, Technip and DSME.

“The keel laying signifies yet another significant achievement of the project in its construction phase,” said Datuk Abdullah Karim, PETRONAS’ Vice President and Venture Director of LNG Projects – Domestic, Gas & Power Business.

“We would like to thank the project teams for their perseverance and dedication that led to this milestone in a safe manner, in line with our plans and expectations,” he added.

The construction of the PFLNG 1 facility, which commenced in June 2013 with the cutting of the steel for its hull, is scheduled to be completed in Quarter 4 of 2015, making it the world’s first to be in operation.

When operational, the facility will have a weight of about 125,000 tonnes and is 365 metres in length, which is equivalent to three times the length of an NFL football field. It will also be the first to use the dual row cargo containment system to ensure limited sloshing within its hull.

The PFLNG 1 facility will be located in Malaysia’s Kanowit gas field, 180 kilometres offshore Sarawak. It will produce 1.2 million tonnes of LNG per year and will play a significant role in PETRONAS’ efforts to unlock the gas reserves in Malaysia’s remote and stranded fields currently deemed uneconomical to develop and evacuate.

[mappress] Press Release, January 08, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free