Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Aveon to Fabricate Subsea Structures for Egina Field
Equipment

January 15, 2014 · about 12 years ago

Aveon to Fabricate Subsea Structures for Egina Field

Aveon Offshore Limited, a Nigerian oil & gas engineering and fabrication company, has been awarded a sub-contract from FMC Technologies Nigeria Ltd for the fabrication of subsea structures for the Egina field, offshore Nigeria. FMC Technologies Ltd was earlier awarded, the Engineering Procurement Co

1 minutes read
  • LinkedIn
  • X
  • Email

Aveon Offshore Limited, a Nigerian oil & gas engineering and fabrication company, has been awarded a sub-contract from FMC Technologies Nigeria Ltd for the fabrication of subsea structures for the Egina field, offshore Nigeria.

FMC Technologies Ltd was earlier awarded, the Engineering Procurement Construction and Commissioning (EPCC) contract for the, Egina Field Subsea Production Systems, by Total Upstream Nigeria Limited..

The Aveon Offshore contract is for the provision of more than 5000 Tons of subsea structures.

The project is being executed by AVEON Offshore at its 240,000 sqm fabrication yard in Rumuolumeni, near Port Harcourt and is expected to generate over 1,000,000 productive man-hours of work.

“The award of this project significantly expands the depth and boundary of our capabilities and provides reassurance to the Nigerian Oil and Gas industry that we are a very dependable local partner. It also proves our willingness and readiness to make the investments required to meet the very exacting expectations of our clients in respect of safety, schedule and quality“ says Tein George, Chairman, Aveon Offshore Limited.

First steel cutting has occurred in December 2013 and the planned load-out and sail-away of the subsea structures is scheduled progressively from the second half of 2015. [mappress] Press Release, January 15, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

25 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

25 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

25 days ago