Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Stevenson Creek Dredging Project Progresses Well (USA)
Business & Finance

January 21, 2014 · about 12 years ago

Stevenson Creek Dredging Project Progresses Well (USA)

The Stevenson Creek dredging project is moving ahead. The project scope consists of dredging approximately 105,000 cubic yards of sediment from the canal. “Reach 1” calls for the removal of 63,000 cubic yards of muck/sand material. This encompasses an area approximately 1700 linear feet long, to a d

2 minutes read
  • LinkedIn
  • X
  • Email

The Stevenson Creek dredging project is moving ahead. The project scope consists of dredging approximately 105,000 cubic yards of sediment from the canal.

“Reach 1” calls for the removal of 63,000 cubic yards of muck/sand material. This encompasses an area approximately 1700 linear feet long, to a depth limit of -3.5 feet NGVD. “Reach 2” calls for the removal of an additional 42,000 cubic yards of muck/sand material. This portion will be dredged approximately 1900 linear feet, to a depth limit of -2.5 feet NGVD.

Gator Dredging has developed and will be executing a material management plan to process dredged material and transport the separated sediment to designated sites. This process includes placing dewatered muck material in an upland site located approximately 21 miles northeast of the project. The plan also calls for the placing of clean, sandy material, to be reused on location if possible.

This material will create 15,488 square yards of mangrove habitat in Stevenson Creek Reaches 1 and 2.

Gator’s engineers plan to develop, maintain, and restore the provided processing site and staging area located near the easterly limit of the project. The Stevenson’s Creek project also includes turbidity monitoring and Acute / Chronic Elutriate testing (if polymers are used in dewatering process).

The principals of Gator Dredging (state-certified general contractors’ license CGC 1510302, founded in 2005) are Bill Coughlin and Jack Adams. Experienced in the engineering and dredging fields, Mr. Coughlin and Mr. Adams have created a company that combines their engineering skills and compassion for the environment. Their commitment and drive is to make Florida’s waterways more accessible by means of canal, slip, and dock dredging.

[mappress]

Press Release, January 21, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago