Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Mauritius: MPA Introduces Port Louis Harbour Dredging Plan
Dredging

January 24, 2014 · about 12 years ago

Mauritius: MPA Introduces Port Louis Harbour Dredging Plan

The Mauritius Ports Authority (MPA) is moving forward with the plans for the extension and strengthening of the Mauritius Container Terminal (MCT) Quay Project at Port Louis Harbour. This development program will include dredging works to deepen the existing navigational channel leading to the Mauri

2 minutes read
  • LinkedIn
  • X
  • Email

The Mauritius Ports Authority (MPA) is moving forward with the plans for the extension and strengthening of the Mauritius Container Terminal (MCT) Quay Project at Port Louis Harbour.

This development program will include dredging works to deepen the existing navigational channel leading to the Mauritius Container Terminal as well as maintenance dredging works in the navigational channel to its Multipurpose Terminal (Terminal II).

The scope of the works will consist of:

– Provision of the necessary cutter suction dredgers and all associated plant and equipment required for dredging in all types of material including hard coral and rock and subsequent disposal of the dredged spoil to the designated locations;

– Dredging in all types of soils in the port basin at the Container Terminal and in the English Channel up to 16.5m depth below chart datum, including transfer and disposal of the dredged spoil at the designated locations;

– Dredging in all types of soils in the navigational channel to the Multipurpose Terminal and alongside Quay No 1 up to 13.5m depth below chart datum, including transfer and disposal of the dredged spoil at the designated locations;

– To carry out all other activities associated with dredging such as Hydrographic Survey and Jet Probing for completion of the dredging project.

The contractor will prepare the disposal sites, including levelling, spreading and creating internal basins with using fill material available at Fort William within the bunded areas, and carry out all associated additional works required to mitigate adverse effects of dredging and land reclamation as per the Environment Impact Assessment (EIA) Report.

[mappress]

Dredging Today Staff, January 24, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free