Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›TZC: “I Lift NY” Super Crane Enters Last Leg of Its Journey (USA)
Dredging

January 28, 2014 · about 12 years ago

TZC: “I Lift NY” Super Crane Enters Last Leg of Its Journey (USA)

The “I Lift NY” super crane began the last leg of its journey this week, completing its passage through the Panama Canal on Jan. 17 and making its way up the eastern seaboard. The super crane’s voyage began on Dec. 22, and early next month it is expected to arrive in the Port of New […]

1 minutes read
  • LinkedIn
  • X
  • Email

The “I Lift NY” super crane began the last leg of its journey this week, completing its passage through the Panama Canal on Jan. 17 and making its way up the eastern seaboard.

The super crane’s voyage began on Dec. 22, and early next month it is expected to arrive in the Port of New York & New Jersey where it will remain docked in the area until it’s brought to the site of the New NY Bridge project this spring. Recently nicknamed “I Lift NY”, the crane is owned by Tappan Zee Constructors, LLC (TZC), and is officially registered with the U.S. Coast Guard as the Left Coast Lifter.

Severe winter weather and icy conditions have resulted in the suspension of TZC’s marine operations for safety purposes. Work will resume on the river once temperatures rise and icy conditions allow for safe operations.

Ongoing operations:

– Rockland access ramp modifications;

– Armoring of dredge channel;

– River Road utility work;

– Test pile program;

– Permanent pile installation;

– Temporary Rockland trestle construction, including pile driving on weekdays 7 a.m. to 7 p.m.;

– Survey inspections on existing bridge;

– Support for river-based work from the Rockland shoreline;

– Reinforcement steel pre-assembly at bridge yard.

[mappress]

Press Release, January 28, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free