Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›New Study to Evaluate Lynnhaven River Ecosystem Restoration (USA)
Dredging

January 30, 2014 · about 12 years ago

New Study to Evaluate Lynnhaven River Ecosystem Restoration (USA)

A feasibility report and integrated environmental assessment, or EA, have been prepared to describe the findings of the Lynnhaven River basin ecosystem restoration study and to assess the potential impacts of the project on the Lynnhaven River basin and surrounding area. The purpose of the study was

1 minutes read
  • LinkedIn
  • X
  • Email

A feasibility report and integrated environmental assessment, or EA, have been prepared to describe the findings of the Lynnhaven River basin ecosystem restoration study and to assess the potential impacts of the project on the Lynnhaven River basin and surrounding area.

The purpose of the study was to evaluate ecosystem restoration within the Lynnhaven River basin and to develop the most suitable restoration plan.

The plan that resulted from this study includes the restoration of approximately 38 acres of wetlands and the planting of 94 acres of sea grasses, also called submerged aquatic vegetation, or SAV. The study also recommends the reintroduction of bay scallops in 22 acres of the Lynnhaven River once sea grass becomes established in the river basin.

The last element of the plan includes the construction of 31 acres of hard-reef habitat.

In compliance with the National Environmental Policy Act, the feasibility report and integrated EA must be available to the public in the affected area for 30 days for review and comment. The public comment period will begin on April 26 and end on May 26, 2013.

[mappress]

Press Release, January 30, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free