Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›IHC Merwede Launches Dredger ‘AL BAHAR’ C/D HUTA 12 (VIDEO)
Business & Finance

March 8, 2014 · about 12 years ago

IHC Merwede Launches Dredger ‘AL BAHAR’ C/D HUTA 12 (VIDEO)

IHC Merwede has successfully named and launched the 23,545kW self-propelled cutter suction dredger ‘AL BAHAR’ C/D HUTA 12 in a ceremony on 8 March 2014 at the company’s shipyard in Kinderdijk, The Netherlands. The ceremony was performed by Ms. Sylvia Wuebbens, the daughter of Mr. M. Wuebbens, the Ma

1 minutes read
  • LinkedIn
  • X
  • Email

IHC Merwede has successfully named and launched the 23,545kW self-propelled cutter suction dredger ‘AL BAHAR’ C/D HUTA 12 in a ceremony on 8 March 2014 at the company’s shipyard in Kinderdijk, The Netherlands.

The ceremony was performed by Ms. Sylvia Wuebbens, the daughter of Mr. M. Wuebbens, the Managing Director of Huta Marine Works.

The contract for the design, construction and delivery of the vessel was signed between Huta Marine Works and IHC Holland, part of IHC Merwede, on 11 October 2012. The keel was laid on 14 August 2013 and the ship will be delivered in the third quarter of 2014.

‘AL BAHAR’ C/D HUTA 12 is equipped with separate accommodation for the sailing and operating crews, a travelling deck crane and azimuth thrusters. The vessel will be deployed predominantly on both sides of the Arabian Peninsula, where she will dredge hard soil in difficult climatic conditions.

Additional information

Name – ‘AL BAHAR’ C/D HUTA 12;

Type – Self-propelled cutter suction dredger;

Customer – Huta Marine Works Ltd.;

Builder – IHC Holland BV;

Length overall – 122.5m;

Breadth – 21.7m;

Depth – 6.8m;

Draught – 5m;

Dredging depth – 28m;

Total installed power – 23,545kW;

Speed – 9 knots;

Accommodation – 40 people.

[mappress]

Press Release, March 8, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free