Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›GTT’s LNG Bunker Barge Design Receives ABS Approval
Vessels

March 28, 2014 · about 12 years ago

GTT’s LNG Bunker Barge Design Receives ABS Approval

GTT North America, a U.S. subsidiary of France’s GTT, has received approval in principle from ABS for the design of a 2,200 cubic meter LNG bunker barge. The design incorporates GTT’s membrane Cargo Containment System (CCS), which is utilized in 70% of the global LNG carrier fleet and nearly 90% of

3 minutes read
  • LinkedIn
  • X
  • Email

GTT North America, a U.S. subsidiary of France’s GTT, has received approval in principle from ABS for the design of a 2,200 cubic meter LNG bunker barge.

The design incorporates GTT’s membrane Cargo Containment System (CCS), which is utilized in 70% of the global LNG carrier fleet and nearly 90% of LNG carrier projects on order, according to a statement by GTT.

“ GTT developed the membrane LNG bunker barge to demonstrate the efficient storage of LNG and safe, reliable management of Boil-Off Gas (BOG) in an unmanned push barge application ,” GTT said.

The barge was designed for use in bunkering operations including ship-to-ship LNG transfers or LNG bulk transport in US inland waterways, harbors, and intra-coastal service. The barge could operate as a mobile refueling resource or be moored temporarily to serve as a refueling station.

“An important step in the wide-range adoption of LNG as a marine fuel is the development of bunkering infrastructure that can adequately meet the various operational needs of vessels,” said ABS Director of US Gas Solutions, Roy Bleiberg. “The use of the LNG bunker barge will be a critical part of infrastructure development and this design, which leverages proven GTT technology, is certainly a concept that LNG stakeholders should consider.”

The CCS selected for the barge was GTT’s Mark III Flex system. The Mark III membrane CCS consists of a cryogenic liner directly supported by the vessel’s inner hull, which allows for “ maximum volumetric utilization of the available cargo space “.

The GTT membrane LNG bunker barge will be capable of loading 2156 m3 (at 98%) or 570,000 gallons within 4.5 hours and towed at maximum speed of 8 knots in an efficient footprint: 64.2 m (212 ft) overall length, 14.8 m (48.5 ft) breadth, 7.2 m (15.7 ft) depth, and 2.6 m (8.5 ft) fully loaded design draft. The dimensions and a gross tonnage of approximately 1,440 GT afford the GTT membrane LNG bunker barge “ greater maneuverability and access throughout inland and intra-coastal waterways “.

“ A distinguishing feature of the GTT membrane LNG bunker barge is the management of natural BOG through small-scale reliquefaction units ,” the company said.

The StirLNG-4 cryo-cooler unit from the Netherlands-based Stirling Cryogenics was the basis of the boil off management system design.

“This barge design, now approved in principle by ABS, provides a robust solution for boil off gas management, an essential requirement for any atmospheric LNG storage system. The design is a major step forward in bringing the coldest cargo with the highest stored energy value to the US LNG fuel market in a safe manner,” said Allyn Risley, Chairman, GTT North America.

Herbert Engineering was commissioned to develop the hull and preliminary machinery design scope and CH-IV International to develop the cargo handling system (CHS) design scope.

ABS Consulting also assisted in the development of the GTT membrane LNG bunker barge project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Vessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

18 days ago