Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›AWE working to complete horizontal drilling at Pateke well
Project & Tenders

April 1, 2014 · about 12 years ago

AWE working to complete horizontal drilling at Pateke well

AWE Limited reports that as at 06:00 hours (6.00am NZDT) today, the Pateke-4H development well sidetrack has been drilled to a measured depth of 4,083m, landing at an angle of 90 degrees and having penetrated the hydrocarbon bearing F10 reservoir sand. Installation of the 9 5/8 inch casing is curren

2 minutes read
  • LinkedIn
  • X
  • Email

AWE Limited reports that as at 06:00 hours (6.00am NZDT) today, the Pateke-4H development well sidetrack has been drilled to a measured depth of 4,083m, landing at an angle of 90 degrees and having penetrated the hydrocarbon bearing F10 reservoir sand.

Installation of the 9 5/8 inch casing is currently in progress, following which the well will be drilled horizontally through the reservoir to a planned measured depth of 5,361m.

The Kapuni F10 sandstone objective has already been intersected on prognosis with oil shows and real time logging measurements indicating the likely presence of an oil bearing reservoir. The commercial significance of the oil shows will not be clear until the horizontal drilling is completed and the reservoir size and quality is fully assessed.

The Pateke-4H development well is in PMP 38158, offshore New Zealand, and AWE is the Operator. Located in the offshore Taranaki Basin, New Zealand, PMP 38158 contains the Tui, Amokura and Pateke fields and has been producing since 2007.

Pateke-4H is targeting a mapped northern extension of the currently producing Pateke field. The well is being drilled in water depth of approximately 124m with a planned total measured depth of 5,361m, including a 1,272m horizontal section. If successful, the well will be completed for subsequent tie-back to the Tui FPSO (“Umuroa”) for production in 2015.

The Joint Venture partners in PMP 38158 are:

AWE Limited (via subsidiaries) (Operator) 57.5%

New Zealand Oil & Gas (via subsidiaries) 27.5%

Pan Pacific Petroleum (via subsidiaries) 15.0%

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

26 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

26 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

26 days ago