Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›ABB Equips Finnish LNG Icebreaker with Electric Power Plant and Propulsion Units
Equipment

May 12, 2014 · about 12 years ago

ABB Equips Finnish LNG Icebreaker with Electric Power Plant and Propulsion Units

ABB, a global leader in power and automation technology, has secured a new order to supply electric power plant and Azipod propulsion units for one icebreaker vessel built for Finnish Transport Agency (FTA) at Arctech Helsinki Shipyard. The competitive bidding was done between several suppliers. Due

2 minutes read
  • LinkedIn
  • X
  • Email

ABB, a global leader in power and automation technology, has secured a new order to supply electric power plant and Azipod propulsion units for one icebreaker vessel built for Finnish Transport Agency (FTA) at Arctech Helsinki Shipyard. The competitive bidding was done between several suppliers.

Due for delivery in 2016 and set for operation in the Baltic Sea, the new vessel is featuring dual fuel capability, and as such will be the first icebreaker in operation able to run using liquefied natural gas (LNG) as a fuel, cutting both emissions and fuel cost.

In fact, the concept designers at Aker Arctic Technology and ILS were instructed to select the industry’s most advanced technologies to meet icebreaking conditions in the Baltic Sea year-round, and to perform open sea oil spill response and towing duties in summer and winter. Basic design of the vessel is done by Arctech. Once operational, the new vessel is expected to attract worldwide attention to Finnish arctic expertise.

Central to the vessel’s performance expectations will be its three-pod propulsion solution, with a 6MW Azipod unit at the bow and two 6.5MW units at the stern included to optimize efficiency and maneuverability in ice-ridge conditions in particular.

“The safety of seaborne transport in the Baltic Sea is under political and regulatory scrutiny as never before, making FTA’s preference for ABB’s power and propulsion technology based on our proven references,” says Heikki Soljama, head of ABB’s Marine and Cranes business unit. “Once more, the system’s performance and its ease of maintenance have proved critical factors in the selection process. It is no coincidence that the most forward-looking icebreaker designs invariably feature podded propulsion.”

[mappress] Press Release, May 12, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

18 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

18 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

18 days ago