Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›DSV Makes Room for Rowan Viking
Shipbuilding

June 19, 2014 · about 12 years ago

DSV Makes Room for Rowan Viking

Damen Shiprepair Vlissingen (DSV), part of Damen Shiprepair & Conversion, has been awarded the contract by a subsidiary of Rowan Companies Plc. to remodel the Rowan Viking. The Rowan Viking is a Keppel Fels ‘N’ Class Drilling Rig. The rig, which at 124 (l) x 95 (w) x 170 (h) metres is one of the [&h

1 minutes read
  • LinkedIn
  • X
  • Email

Damen Shiprepair Vlissingen (DSV), part of Damen Shiprepair & Conversion, has been awarded the contract by a subsidiary of Rowan Companies Plc. to remodel the Rowan Viking.

The Rowan Viking is a Keppel Fels ‘N’ Class Drilling Rig. The rig, which at 124 (l) x 95 (w) x 170 (h) metres is one of the largest of its type, is active in the North Sea.

The Rowan Viking has been contracted to explore the Norwegian Lundin Oil Field and will have to be converted accordingly. The work will consist of:

Because the leg extension work will be done at great heights, DSV has contracted Palfinger Systems to use the latter’s JUMP Systems (Jack Up Maintenance Platform).

These are platforms that can be built around, and moved up and down the legs.

Mammoet’s largest PTC cranes will be used to hoist the 120-tonne leg extensions.

The crane will be more than 200 metres high (nearly four times the height of the covered dock at the shipyard in Vlissingen).

To make room for the crane, DSV has moved its warehouse, demolishing the warehouse itself and building a special foundation that can handle the high ground pressure of 30 tonnes per m² that the crane will create.

The Rowan Viking will be at the shipyard for approximately 130 days.

[mappress] June 19, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free