Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Construction Starts on LUKOIL’s New Supply Duo
Shipbuilding

June 23, 2014 · about 12 years ago

Construction Starts on LUKOIL’s New Supply Duo

Construction of two supply vessels commissioned by the Russian oil company LUKOIL has started with a steel cutting ceremony held at the Keppel Nantong Shipyard Co. Ltd., China. The supply vessels will be 80.00 metres in length, with 16.50 metres of width, 6.20 metres of depth, a summer draft of 3.80

2 minutes read
  • LinkedIn
  • X
  • Email

Construction of two supply vessels commissioned by the Russian oil company LUKOIL has started with a steel cutting ceremony held at the Keppel Nantong Shipyard Co. Ltd., China.

The supply vessels will be 80.00 metres in length, with 16.50 metres of width, 6.20 metres of depth, a summer draft of 3.80 metres, and with a 1000 dwt.

They are designed to supply resources to the Vladimir Filanovsky field development facilities in the northern part of the Caspian Sea and to ensure their safe operation.

Completion of construction is scheduled for September 2015.

In accordance with the Agreement on the classification of ships under construction, signed by RS and Keppel Nantong Shipyard in the spring of 2014, RS provides a full range of classification and statutory services during their construction.

Survey during construction will be implemented by the RS Branch Office in China.

When the vessels comply with all applicable international requirements and RS rules, they will be assigned the class notation КМ✪ Arc4 [1] AUT1 ICS FF3WS DYNPOS-2 Supply Vessel.

Ice model tests were successfully conducted on the hulls of this design in the ice model basin of Aker Arctic (Finland) in March 2014.

The presence of Arc4 ice strengthening allows them to work effectively during the winter.

The project also envisages equipping the vessels with systems to extinguish fires on fixed offshore platforms and at the transshipment terminal, as well as equipment to deal with oil spills.

Moreover, as part of the project to develop the Vladimir Filanovsky field and further cooperation with LUKOIL, a rescue vessel is being built at the Singapore shipyard Keppel Singmarine Pte Ltd.

[mappress] June 23, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free