Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›SeaGen Maintenance Operations Underway
Authorities & Government

September 25, 2014 · about 12 years ago

SeaGen Maintenance Operations Underway

According to a notice to mariners for Strangford Narrows area issued yesterday, 24th September, planned operations on the SeaGen tidal turbine system are currently being undertaken and may impact navigation. SeaGen is a tidal turbine comprising of a central pile and crossbeam that holds the turbines

2 minutes read
  • LinkedIn
  • X
  • Email

According to a notice to mariners for Strangford Narrows area issued yesterday, 24th September, planned operations on the SeaGen tidal turbine system are currently being undertaken and may impact navigation.

SeaGen is a tidal turbine comprising of a central pile and crossbeam that holds the turbines at the extremities. When the crossbeam is raised above the water it presents a 43m wide obstruction in the narrows at a height of 5.9m from chart datum. The SeaGen structure is marked as an isolated hazard (red and black banded) and lit with a 4nm light with two rapid flashes every ten seconds (Fl(2)10s).

The crossbeam will be raised for inspection and maintenance work on Mon 29th Sept. It is expected that the crossbeam will be raised for a period of 5 days and care should be taken when operating vessels in the vicinity of the structure during these periods.

For safety, it is requested that all craft keep a safe distance of at least 50m from the SeaGen pile whilst the crossbeam is raised.

When the crossbeam is left up for any overnight period it will be flood lit with spotlights showing the extremity of the obstruction which protrudes 20m either side of the main pile.

Between 1st April and 30th September when the crossbeam is raised but the turbine is unmanned, the Cuan Rhib will be on standby to provide escort during daylight hours only, if requested.

Outside of those times an escort service can be provided on request with 48 hours notice.

[mappress mapid=”14225″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentOperations & MaintenanceTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

17 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

17 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

18 days ago