Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Floating Wind Test Site in Mediterranean Sea Fully Permitted
Authorities & Government

November 11, 2014 · about 11 years ago

Floating Wind Test Site in Mediterranean Sea Fully Permitted

During the 3rd General Assembly of the INFLOW (INdustrialization setup of a FLoating Offshore Wind turbine) demo project, which was held on October 22nd 2014, it was announced that a key milestone of the project has been successfully reached. The offshore site for testing the novel floating vertical

1 minutes read
  • LinkedIn
  • X
  • Email

During the 3rd General Assembly of the INFLOW (INdustrialization setup of a FLoating Offshore Wind turbine) demo project, which was held on October 22nd 2014, it was announced that a key milestone of the project has been successfully reached.

The offshore site for testing the novel floating vertical axis wind turbine (VAWT) to be developed during the INFLOW project has been approved and fully authorized by the responsible prefecture of the Bouches-du-Rhone department. The test site situated in the Mediterranean Sea 5 km off the coast at Port-Saint-Louis-du-Rhone can support two full scale VAWTs and will be operated by MISTRAL, a joint venture of the INFLOW consortium partners EDF Energies Nouvelles and Nenuphar. It will be the world’s first offshore test site with multiple floating wind turbines.

Directed by French engineering company Technip and funded by the European Commission’s Seventh Framework Programme, the main target of INFLOW is to optimize the existing onshore VAWT prototype produced by its predecessor projects VERTIFLOAT and VERTIWIND and to manage all aspects required to initiate a viable industrialisation phase.

With a high stability through the low centre of gravity and high reliability due to the missing yaw and pitch controls and gear box, VAWTs are a very promising solution |for converting wind energy offshore.

[mappress mapid=”14727″]

Press release; Image: inflow-fp7 (Artist’s impression of the VAWTs at nighttime.)

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

18 days ago

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

18 days ago
Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

19 days ago