Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Revamped MSC Armonia Ready for Service
Shipbuilding

November 18, 2014 · about 12 years ago

Revamped MSC Armonia Ready for Service

MSC Armonia, the first out of four MSC Lirica Class ships in the EUR 200 million “Renaissance Programme” launched by Fincantieri and MSC Cruises, has left the Palermo shipyard after little more than 10 weeks since her arrival on 31 August. The modification works on Armonia included the insertion of

2 minutes read
  • LinkedIn
  • X
  • Email

MSC Armonia, the first out of four MSC Lirica Class ships in the EUR 200 million “Renaissance Programme” launched by Fincantieri and MSC Cruises, has left the Palermo shipyard after little more than 10 weeks since her arrival on 31 August.

The modification works on Armonia included the insertion of an entire pre-built mid-ship section, started at the end of July, providing an addition of approximately 200 cabins, as well as new entertainment spaces and new technological enhancements.

The ship has left the shipyard to sail to Genoa, from where she will depart on a 10-day inaugural cruise to the Canary Islands.

The “Renaissance Programme”, announced in December 2013 by MSC Cruises and Fincantieri, also includes MSC Lirica, MSC Sinfonia and MSC Opera, and will be completed in 2015.

The remaining ships in MSC’s Lirica class “Renaissance Programme” will follow the dry dock schedule below:

• MSC Sinfonia (2005): 12 January to 16 March 2015; • MSC Opera (2004): 2 May to 4 July 2015; • MSC Lirica (2003): 31 August to 9 November 2015.

The four Lirica Class ships were built between 2003 and 2005 at the STX yards in Saint-Nazaire, France. With the exception of Armonia, they are currently 251 metres long, weigh 60,000 tonnes and can carry 2,069 passengers.

After the “Renaissance Programme” the ships will be 275 meters long, weigh 65,000 tonnes and carry 2,680 passengers, boasting 193 additional cabins (plus 59 new cabins for crew members).

Press Release

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free