Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›GALLERY: MSC Magnifica Ready for Next Cruise
Shipbuilding

November 27, 2014 · about 12 years ago

GALLERY: MSC Magnifica Ready for Next Cruise

After a 17-day drydocking the cruise ship MSC Magnifica left Damen Shiprepair Rotterdam for Hamburg on schedule to start her next cruise, Damen said in a release. Damen Shiprepair replaced some 47 tonnes of steel, replaced the rudders, cleaned and painted the vessel. Built in 2010, the MSC Magnifica

2 minutes read
  • LinkedIn
  • X
  • Email

After a 17-day drydocking the cruise ship MSC Magnifica left Damen Shiprepair Rotterdam for Hamburg on schedule to start her next cruise, Damen said in a release.

Damen Shiprepair replaced some 47 tonnes of steel, replaced the rudders, cleaned and painted the vessel.

Built in 2010, the MSC Magnifica is 293 m long and has a capacity for more than 2,500 passengers.

“ The rudders were a major job, we sealed off and pressurised the whole area. And fortunately we have a very large machine shop on site, which was invaluable to ensure the rudder renewal remained on schedule. We also worked very closely with the rudder manufacturer Rolls-Royce, ” Derks said.

She arrived at Damen Shiprepair Rotterdam on October 20 and was berthed at the yard’s largest drydock, which is 307 m in length.

Commenting on the MSC Magnifica project, Marc Derks, Shiprepair Rotterdam Project Manager, said: “ This was an excellent operation, I am very proud of the team. The advance planning and preparation paid off.”

Mr Derks stresses that this project had the added challenge that the ship’s 800-strong crew remained on board during the work.

“ The crew were fantastic and helped us a lot. It was a really great cooperation .”

Next week, on December 2 another cruise vessel will arrive at Damen Shiprepair Rotterdam – the 200 m MS Saga Sapphire.

var cpo = []; cpo["_object"] ="cp_widget_e343defb-64a1-48e3-a371-ea5be2bbf909"; cpo["_fid"] = "AUOAEKcGaI6W"; var _cpmp = _cpmp || []; _cpmp.push(cpo); (function() { var cp = document.createElement("script"); cp.type = "text/javascript"; cp.async = true; cp.src = "//www.cincopa.com/media-platform/runtime/libasync.js"; var c = document.getElementsByTagName("script")[0]; c.parentNode.insertBefore(cp, c); })(); Powered by Cincopa Video Hosting for Business solution. MSC Magnifica MSC Magnifica Drydocking originaldate 1/1/0001 6:00:00 AM width 720 height 773 originaldate 1/1/0001 6:00:00 AM width 1353 height 908 originaldate 1/1/0001 6:00:00 AM width 1232 height 912 originaldate 1/1/0001 6:00:00 AM width 1216 height 908 originaldate 1/1/0001 6:00:00 AM width 692 height 869 originaldate 1/1/0001 6:00:00 AM width 1220 height 898 originaldate 1/1/0001 6:00:00 AM width 1225 height 909 originaldate 1/1/0001 6:00:00 AM width 1369 height 893 originaldate 1/1/0001 6:00:00 AM width 1223 height 890 Press Release; Images: Damen

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free