Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Bollinger Shipyards Adds Two Dry-Docks
Shipbuilding

December 11, 2014 · about 11 years ago

Bollinger Shipyards Adds Two Dry-Docks

Bollinger Shipyards has taken delivery of two dry-docks with a total lifting capacity of 12,000 tons. One of the docks, a 10,500 ton dry-dock will be located at the Bollinger Port Fourchon facility, and measures 320-ft. x 100-ft. between the wing walls. Bollinger now has three commercial dry-docks l

2 minutes read
  • LinkedIn
  • X
  • Email

Bollinger Shipyards has taken delivery of two dry-docks with a total lifting capacity of 12,000 tons.

One of the docks, a 10,500 ton dry-dock will be located at the Bollinger Port Fourchon facility, and measures 320-ft. x 100-ft. between the wing walls.

Bollinger now has three commercial dry-docks located in Fourchon with a combined lifting capacity of over 22,000 tons.

The second dock, a 1,500 ton dry-dock will be located at the Bollinger Quick Repair (BQR) facility in Harvey, Louisiana, and measures 160-ft x 60-ft between the wing walls.

BQR is located off the Mississippi River on the Harvey Canal and provides service to both the inland and offshore marine transportation sector with six dry-docks ranging from 900 to 3,400 ton lifting capacity.

The announcement was made by Bollinger Chief Operating Officer, Ben Bordelon,however, terms and conditions of the purchase remained undisclosed.

Bollinger recently announced the development of Bollinger Fourchon North at the Port of Fourchon.

The facility is schedule to open in the 2 nd quarter of 2015.

In addition to the three docks currently in the port for Bollinger, the facility will include a business park with housing, fabrication and machining for subsea equipment, structural components for subsea pipelines and deepwater developments, as well as project and equipment laydown areas.

The shipbuilder said that the current Bollinger facility, Bollinger Fourchon South, will continue focusing on rig, topside repairs and conversions on the main channel in the Port of Fourchon.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free