Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Aker Philadelphia Lays Keel for Second Crowley Tanker
Shipbuilding

December 24, 2014 · about 11 years ago

Aker Philadelphia Lays Keel for Second Crowley Tanker

Aker Philadelphia Shipyard held on December 23 a ceremonial keel laying for the second of four product tankers it is building for its joint venture with Crowley. Aker also started construction on the fourth product tanker in the same series. At the keel laying ceremony, coins were placed on one of t

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Philadelphia Shipyard held on December 23 a ceremonial keel laying for the second of four product tankers it is building for its joint venture with Crowley. Aker also started construction on the fourth product tanker in the same series.

At the keel laying ceremony, coins were placed on one of the keel blocks before the 580-ton unit, which will be part engine room of the completed ship, was lowered into place in the dry dock. This tradition dates back to early shipbuilding and signifies good fortune and safe travels.

The day before the keel laying ceremony, representatives from both companies gathered in the Fabrication Shop to begin cutting the first plate of the fourth product tanker in the series. That plate will become part of the double hull of the tanker that protects the cargo tanks. When completed in 2015 and 2016, these vessels will be 600 feet long and be capable of carrying 50,000 tons of crude oil or refined petroleum products.

Steinar Nerbovik, APSI’s President and CEO, said: “We now have all four product tankers we are building with Crowley under construction in various stages throughout the shipyard. I am proud of the hard working men and women of the shipyard and the quality vessels that they produce. Our workforce has grown along with our backlog of work and I look forward to completing these vessels and many more together.”

The new 50,000 dwt product tankers are based on a Hyundai Mipo Dockyards (HMD) design. The vessels will be constructed with consideration for the use of LNG for propulsion in the future.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free