Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Saacke tech ordered for Petronas’ second FLNG
Equipment

January 13, 2015 · about 11 years ago

Saacke tech ordered for Petronas’ second FLNG

Saacke Marine Systems received an initial order from Japan-based JGC Corporation in June 2014 to deliver a complete high-temperature water boiler system for Petronas’ second floating liquefied natural gas facility.

2 minutes read
  • LinkedIn
  • X
  • Email

Saacke Marine Systems received an initial order from Japan-based JGC Corporation in June 2014 to deliver a complete high-temperature water boiler system for Petronas’ second floating liquefied natural gas facility.

The system consists of a fired hot water boiler with a dual fuel burner and two heat recovery units.

The Saacke heat recovery units utilize the hot flue gas generated by gas turbines to produce hot water for the heating system. The capacity of this waste heat recovery heater (WHRH) is 24.2 MW Hot water (outlet temperature 210°C, 31.1 barg).

The hot water is used for heating purposes and as process heat. If additional capacity is required, or the upstream gas turbines are shut down, the fired Saacke high-temperature water boiler FMW-VD with DDZG dual fuel burner can take over a part of the heating capacity.

“The dual fuel burner is characterized by its compliance with high environmental standards and its flexibility in the selection of fuel. It can be operated using either gas or oil (marine gas oil). The energy-efficient use of waste heat also increases the environmental compatibility and efficiency of the system,” said P eter Breidenich, Director Business Unit Marine Systems .

The hot water heater and the WRHU will be manufactured at Saacke’s Chinese production location in Qingdao while the burners and system control technology will be designed and produced at the head office in Bremen. The entire system is scheduled to be delivered in May 2015. Until then, Saacke is responsible for the entire process chain, from the overarching project management through to the engineering, design, production and commissioning.

[mappress mapid=”16465″]

Press Release; Image: Saacke Marine Systems

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & TendersVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

20 days ago

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

20 days ago
WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

20 days ago