Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Malta Thumbs Down Offshore Wind Project
Authorities & Government

February 26, 2015 · about 11 years ago

Malta Thumbs Down Offshore Wind Project

The Malta Environment and Planning Authority (MEPA) Board has said no to Is-Sikka l-Bajda offshore wind farm. The Board agreed with the Planning Directorate’s recommendation that the detrimental consequential effects on the environmental protection, in particular the avifauna and marine ecology, of

2 minutes read
  • LinkedIn
  • X
  • Email

The Malta Environment and Planning Authority (MEPA) Board has said no to Is-Sikka l-Bajda offshore wind farm.

The Board agreed with the Planning Directorate’s recommendation that the detrimental consequential effects on the environmental protection, in particular the avifauna and marine ecology, of the surrounding area over ride the benefits achieved through the generation of renewable energy from the proposed wind farm.

The proposal included the installation of 19 wind turbines, over an area of 11 square kilometers.

Both the Appropriate Assessment (AA) study and the draft Environment Impact Statement (EIS) concluded that effective mitigation measure are not possible to address the major adverse impact that this project will have on the land and sea uses, the avifauna, the geological and geomorphologic heritage and the visual and landscape amenity.

The Board also refused planning permission for the proposed rehabilitation of a disused quarry as a temporary storage for bulky refuse and the parking of related collection vehicles. The quarry situated in an area known as Tat-Tomna limits of Mellieha consists of a stretch of excavated land located on a gently slope within a protected Area of High Landscape Value (AHLV), an Area of Ecology Importance (AEI) and a Site of Scientific Importance (SSI).

The Board cited that although such a proposed activity in itself may be considered as a positive means of recycling bulky refuse, other sites which are appropriate or designated to cater for such an activity should be sought.

Image: mrra

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentEnvironment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago