Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›DSME Begins Construction on Teekay’s Yamal LNG Carriers
Shipbuilding

March 10, 2015 · about 11 years ago

DSME Begins Construction on Teekay’s Yamal LNG Carriers

The keel of the first of nine Liquefied Natural Gas (LNG) carriers ordered by Teekay Corporation has been laid at South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering Co., Ltd, Teekay said. Teekay signed up for six 170,000-cbm Arc7 vessels and Mitsui OSK Lines (MOL), in partnership with

2 minutes read
  • LinkedIn
  • X
  • Email

The keel of the first of nine Liquefied Natural Gas (LNG) carriers ordered by Teekay Corporation has been laid at South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering Co., Ltd, Teekay said.

Teekay signed up for six 170,000-cbm Arc7 vessels and Mitsui OSK Lines (MOL), in partnership with China Shipping LNG, has three vessels on order from the batch. The ships are said to be priced at around USD 316 million each totaling in USD 2.8 billion overall.

The ships will feature Electronically Controlled, Gas Injection (MEGI) twin engine and are intended to serve the Yamal LNG Project, which is located on the Yamal Peninsula in Northern Russia.

According to Teekay LNG, the scaffolding is installed temporarily for the assembly of the cargo containment system, comprising around 60,000 insulation blocks per ship.

The vessels are among the largest LNG carriers that will be able to transit the Panama Canal after its expansion is complete.

The first vessel from the batch is scheduled for delivery in 2016, the final one joining the fleet in 2019.

Yamal LNG, a joint venture between Russia-based Novatek (60 percent), France-based Total (20 percent) and China-based China National Petroleum Corporation ( CNPC ) (20 percent), will consist of three LNG trains with a total expected capacity of 16.5 million metric tons of LNG per year and is currently scheduled to start-up in early-2018.

The project’s first commercial cargo is due to be shipped in 2017. The chosen route for the LNG cargo is the Northern Sea Route (NSR).

World Maritime News Staff; Images: Teekay Corporation

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free