Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ABS Validates OTI’s Floating Power Plant
Business & Finance

March 11, 2015 · about 11 years ago

ABS Validates OTI’s Floating Power Plant

ABS has granted approval in principle (AIP) to Maryland-based OTEC International LLC (OTI) for its 5–7 megawatt ocean thermal energy conversion (OTEC) Floating Power Plant (FPP). The FPP is designed to generate consistent electrical power for a commercial utility grid in the world’s tropical and sub

1 minutes read
  • LinkedIn
  • X
  • Email

ABS has granted approval in principle (AIP) to Maryland-based OTEC International LLC (OTI) for its 5–7 megawatt ocean thermal energy conversion (OTEC) Floating Power Plant (FPP).

The FPP is designed to generate consistent electrical power for a commercial utility grid in the world’s tropical and sub-tropical zones.

The FPP design uses seawater to turn solar energy into power in a process known as OTEC. During OTEC, heat from warm surface water vaporizes a working fluid, which drives a turbine generator to produce electricity. Deep seawater cools the working gas back to liquid, and the process begins again in a 24/7, closed-loop cycle.

“Thermal energy conversion demonstrates considerable potential as a renewable energy source, and ABS is proud to partner with innovators like OTI on pioneering projects such as the OTEC FPP,” says ABS Chairman and CEO Christopher J. Wiernicki.

Key elements of the design evaluated by ABS include the barge hull and mooring system, energy conversion equipment, hazardous materials handling and storage, cold-water import conduit and warm-water reintegration conduit suspended in a moonpool and the interconnection manifold as well as the power transmission cable with securing, anchoring and suspension arrangements. ABS reviewed the design for a 25-year service life.

This AIP is OTI’s third from ABS, which awarded AIP for both the 25-MW and 100-MW moored OTEC spar designs in May 2011. OTI is the only company to have received AIP from ABS for OTEC-driven platform designs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEnvironmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago