Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Statoil: Green light from NPD for Norwegian Sea well
Fossil Energy

March 13, 2015 · about 11 years ago

Statoil: Green light from NPD for Norwegian Sea well

The Norwegian Petroleum Directorate (NPD) has granted Statoil Petroleum AS a drilling permit for well 6706/12-3, in the Norwegian Sea. Well 6706/12-3 will be drilled from the Transocean Spitsbergen drilling rig after completing the drilling of wildcat well 6706/12- 2 for Statoil Petroleum AS in prod

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Petroleum Directorate (NPD) has granted Statoil Petroleum AS a drilling permit for well 6706/12-3, in the Norwegian Sea.

Well 6706/12-3 will be drilled from the Transocean Spitsbergen drilling rig after completing the drilling of wildcat well 6706/12- 2 for Statoil Petroleum AS in production licence 218.

The drilling programme for well 6706/12-3 relates to drilling of a wildcat well in production licence 602.

Statoil Petroleum AS is the operator with an ownership interest of 30 per cent. The other licensees are Centrica Resources AS (20 per cent), Petoro AS (20 per cent), Rocksources Exploration Norway AS (10 per cent), Wintershall Norge AS (10 per cent) and Atlantic Petroleum Norge (10 per cent).

The area in this licence consists of a part of block 6706/10, block 6706/11 and a part of block 6706/12. The well will be drilled about 16 kilometres west of Aasta Hansteen (the Haklang field).

Production licence 602 was awarded on May 13, 2011 in the 21st licensing round on the Norwegian shelf. This was the first well to be drilled in the licence.

According to the NPD, the permit is contingent upon the operator securing all other permits and consents required by other authorities prior to starting drilling activities.

[mappress mapid=”1387″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free