Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›ABB Wins NordLink Job
Business & Finance

March 19, 2015 · about 11 years ago

ABB Wins NordLink Job

ABB has won orders worth around $900 million from a consortium comprising utilities Statnett and TenneT as well as promotional bank KfW to supply onshore high-voltage direct current (HVDC) converter stations and the cable system in the German sector that will facilitate the first ever interconnectio

2 minutes read
  • LinkedIn
  • X
  • Email

ABB has won orders worth around $900 million from a consortium comprising utilities Statnett and TenneT as well as promotional bank KfW to supply onshore high-voltage direct current (HVDC) converter stations and the cable system in the German sector that will facilitate the first ever interconnection between the Norwegian and German power grids.

ABB will design, engineer, supply and commission two 525 kilovolt (kV), 1,400 MW converter stations, using its Voltage Sourced Converter (VSC) technology, called HVDC Light®. One station will be situated near Tonstad in southern Norway and the other near Wilster in northern Germany.

As part of the project, ABB will also design, manufacture and install a 525 kV mass impregnated (MI) cable system in the German sector, which will include 154 km of subsea and 54 km of underground cable.

The link will be 623 kilometers (km) long, making it the longest HVDC connection in Europe. It is scheduled to go into commercial operation in 2020. The contract also includes a five-year service agreement.

NordLink will be key in connecting Norway with Germany and has been designated as one of the European Commission’s projects of common interest to help create an integrated European Union energy market.

It will increase energy security in both countries and support the integration of renewable energy into the countries’ grids by allowing surplus wind and solar power produced in Germany to be transmitted to Norway, and hydroelectric power to be transmitted in the opposite direction.

The link will transmit power at a record capacity of 1,400 MW, which is enough to supply 3.6 million German households.

Image: ABB

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

12 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

12 days ago