Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Overview of OTEC developments
Authorities & Government

April 1, 2015 · about 11 years ago

Overview of OTEC developments

It is estimated that between 30.000 and 90.000 TW/h year of power are extractable without having negative impacts on the thermal characteristics of the oceans, according to 2014 JRC Ocean Energy Report. Ocean thermal energy conversion (OTEC) captures the temperature difference between cooler deep an

2 minutes read
  • LinkedIn
  • X
  • Email

It is estimated that between 30.000 and 90.000 TW/h year of power are extractable without having negative impacts on the thermal characteristics of the oceans, according to 2014 JRC Ocean Energy Report .

Ocean thermal energy conversion (OTEC) captures the temperature difference between cooler deep and warmer shallow ocean water to produce electricity.

There are three kinds of OTEC systems: closed-cycle, open-cycle, and hybrid.

OTEC plants can be based onshore (land-based and near-shore) or offshore. OTEC technology is most suitable for the equatorial areas.

The first OTEC plant that generated electricity was built in 1978. ‘Mini-OTEC’ had 50 kW of capacity, and it represented a closed-cycle OTEC system.

There are several larger OTEC projects being planned currently – most of which are of 10 MW in capacity.

OTEC plants rely on already-developed and proven technology from conventional steam power plants, with marine components such as floating platforms or mooring systems that are available from other offshore industries, it is stated in JRC’s report.

The most expensive components of an OTEC plant are the platforms, heat exchangers and pipework.

According to JRC, the respective share of each of the components depends on the specific plant layout and type, but can reach up to 50 percent of the cost for the heat exchangers in the case of large-scale plants, and 50 percent for pipework in the case of small land-based plants.

Graphics: Bluerise/OES (areas suitable for OTEC deployment)/2014 JRC Ocean Energy Report

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

18 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

18 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

19 days ago