Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Port of Cherbourg quay extension completed
Authorities & Government

April 6, 2015 · about 11 years ago

Port of Cherbourg quay extension completed

The extension of the “Quai de Flamands” at port of Cherbourg has been completed this March. The port of Cherbourg now comprises a 680 m linear wharf that is accessible to vessels up to 14 m draught, and has a bearing capacity of 15 t/m2. The extension was performed within the framework for renewable

1 minutes read
  • LinkedIn
  • X
  • Email

The extension of the “Quai de Flamands” at port of Cherbourg has been completed this March.

The port of Cherbourg now comprises a 680 m linear wharf that is accessible to vessels up to 14 m draught, and has a bearing capacity of 15 t/m2.

The extension was performed within the framework for renewable marine energies project.

The quay is also designed to handle heavy and industrial cargo.

The extension was inaugurated by the unloading of two heating units, each weighing 150 tonnes, from the Eendracht ship from Savona, Ports of Normandy Authority’s press release reads.

[mappress mapid=”308″]

Image: Ports Normands Associés

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

19 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

19 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

20 days ago