Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GMC designs buoyant tower for Energean’s Prinos field
Business & Finance

April 16, 2015 · about 11 years ago

GMC designs buoyant tower for Energean’s Prinos field

GMC LTD has just completed the Basic Design of a self-installing Buoyant Tower for the Prinos Field Development for Energean Oil and Gas (Athens, Greece). The design brief was twofold to find a way to extend the life and utility of the existing Prinos infrastructure, and to find a cost effective and

2 minutes read
  • LinkedIn
  • X
  • Email

GMC LTD has just completed the Basic Design of a self-installing Buoyant Tower for the Prinos Field Development for Energean Oil and Gas (Athens, Greece).

The design brief was twofold to find a way to extend the life and utility of the existing Prinos infrastructure, and to find a cost effective and flexible solution for the green field expansion of the existing Prinos facility, GMC said.

The existing wellhead platform (Prinos Alpha) was reanalyzed, and strengthened to accommodate drilling using the Energean newly acquired and commissioned Energean Force (formerly Glen Esk) tender assist drilling rig. The focus was on finding an efficient solution to extending the utility of the existing infrastructure.

“GMC delivered a design for the retrofit of the existing platform that was both efficient and leveraged the local supply chain and workforce to deliver the platform modifications,” the company said in the press release.

For the greenfield solution, GMC developed a full field plan to connect the greenfield facilities to the existing offshore processing facility (Prinos Delta), including j-tube and riser retrofits.

Accordingt to GMC, the greatest contribution to the efficiency of the whole development project was a reconfigured and redesigned GMC Buoyant Tower which has been engineered to accommodate the unique challenges of the field location. Away from any oil and gas centers, the challenge was to develop an offshore facility design that could be fabricated locally and self-installed. The key benefit of the design was that it could be installed without the use of heavy lift vessels, and using only locally available marine assets, GMC explained.

Mathios Rigas , CEO, Energean explained: “GMC has proven to be a true partner in helping us develop solutions that meet Energeans’ unique challenges. GMC’s unique approach to addressing technical and commercial constraints has helped in driving this project forward.”

Dr Steve Moore , Technical Director, Energean, added: “GMC has been an integral part in developing and shaping our contracting and execution strategy on this project. They (GMC) have delivered a Basic Design which gives us confidence that the execution phase of the project will proceed according to schedule and plan.”

While Vibor Paravic , General Manager GMC explained: ”GMC has succeeded in leveraging our 20+ years of experience in working on technically challenging projects to deliver a bespoke solution for both the brownfield and the greenfield challenges faced by Energean. We look forward to the next phases of the project. ”

[mappress mapid=”1558″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentExploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago