Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›KrisEnergy hits pay in Gulf of Thailand sidetrack
Fossil Energy

April 17, 2015 · about 11 years ago

KrisEnergy hits pay in Gulf of Thailand sidetrack

KrisEnergy’s Rossukon-3ST sidetrack exploration well, located in G6/48 in the Gulf of Thailand, has encountered 148 feet TVD of oil and gas pay. The well was spud on April 15, 2015, by the Key Gibraltar jack-up rig and is the last of four wells in the 2015 drilling campaign in the contract area. Ros

2 minutes read
  • LinkedIn
  • X
  • Email

KrisEnergy’s Rossukon-3ST sidetrack exploration well, located in G6/48 in the Gulf of Thailand, has encountered 148 feet TVD of oil and gas pay.

The well was spud on April 15, 2015, by the Key Gibraltar jack-up rig and is the last of four wells in the 2015 drilling campaign in the contract area.

Rossukon-3ST, drilled from the same surface location as the Rossukon-3 exploration well , reached a total depth of 6,645 feet (2,025 metres) measured depth, or -4,500 feet true vertical depth subsea.

According to the press release, KrisEnergy’s preliminary interpretation of well logs indicates that the well intersected approximately 85 feet true vertical depth (TVD) of net oil-bearing sandstones and 63 feet TVD of net gas-bearing sandstones over several reservoir intervals. Water depth at the Rossukon-3 location is 208 feet. The Rossukon-3 location is 1.9 km west of the Rossukon-2 surface location and 1.8 km northwest of the original Rossukon-1 discovery well, drilled in 2009.

Chris Gibson-Robinson , Director Exploration & Production, commented: “This final sidetrack completes our exploration drilling program in G6/48 for this year. All four wells have encountered oil and gas and have provided a great amount of information, which will be incorporated in our geological model and reviewed in the coming months as we assess a development plan.”

G6/48 covers 566 sq. km over the Karawake Basin and lies to the north of the G10/48 licence, where KrisEnergy is developing the Wassana oil field. KrisEnergy took over operatorship of G6/48 in May 2014. The company holds a 30% working interest in the concession and is partnered by Northern Gulf Petroleum Pte Ltd with 40% and Mubadala Petroleum with 30%.

The Key Gibraltar jack-up rig is owned by Shelf Drilling (Southeast Asia) Limited. The rig will now move to G10/48 in the Gulf of Thailand, where it will drill the Rayrai-1 exploration well followed by 15 development wells in the Wassana oil development.

[mappress mapid=”1565″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free