Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›MISC’s revenue up despite lower LNG earnings
Clean Fuel

May 1, 2015 · about 11 years ago

MISC’s revenue up despite lower LNG earnings

MISC posted a group revenue for the first quarter 2015 of RM2,490.3 million, 8.7% higher than RM2,290.5 million in the corresponding quarter last year.

2 minutes read
  • LinkedIn
  • X
  • Email

MISC posted a group revenue for the first quarter 2015 of RM2,490.3 million, 8.7% higher than RM2,290.5 million in the corresponding quarter last year.

The increase in group revenue was mainly due to improved freight rates in petroleum business and commencement of finance lease income of a Floating, Production, Storage and Offloading unit in September 2014. However, a smaller fleet of operating vessels in chemical business and lower earning days in LNG business moderated the increase in group revenue, MISC said in a statement.

During the quarter, MISC entered into novation agreement for the construction and delivery of five new LNG carriers from Petronas. MISC also entered into time charter agreements with Petronas for the charter of the five newbuild LNG carriers.

The group has also secured 10-year lease extension on a time charter basis for five refurbished Puteri Class LNG carriers.

Group operating profit of RM468.2 million was 7.2% lower than the corresponding quarter’s profit of RM504.3 million, mainly due to lower revenue in LNG business and additional costs incurred on some heavy engineering projects. However, higher profit in offshore business and lower losses in chemical business helped to mitigate the decrease in group operating profit.

Group profit before tax of RM511.9 million was 3.0% lower than the RM527.9 million profit in the corresponding quarter, mainly due to lower operating profit in the current quarter.

The financial performance for the group in 2015 will continue to be underpinned by secure recurring income from a portfolio of long-term contracts in the LNG shipping and offshore business segments. Despite the severe drop in global oil prices in the past few months, petroleum shipping segment has found strength from sustained global oil production. Barring any material cutbacks in global oil production, the recent strength in petroleum shipping could be sustained for the year. Chemical shipping prospects remain mixed given uncertainty in demand as a result of sluggish growth in certain economic zones.

However, it will be a challenging year for the oil and gas services segment, such as fabrication and construction given the reduction in capital and operating expenditures by major oil companies in a low oil price environment. The group’s heavy engineering business will draw on its present order book along with other cost management and operational excellence initiatives to sustain profitability during the year.

[mappress mapid=”17212″]

Image: MISC

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free