Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Chevron still sees Angola LNG startup by year-end
Clean Fuel

May 5, 2015 · about 11 years ago

Chevron still sees Angola LNG startup by year-end

Oil and gas giant Chevron is still expecting the Angola LNG export plant to restart operations by the end of this year. The US$10 billion LNG plant, which shipped its first cargo in June of 2013, was shut down in April last year after a major rupture on a flare line. “Work is still underway. [&helli

2 minutes read
  • LinkedIn
  • X
  • Email

Oil and gas giant Chevron is still expecting the Angola LNG export plant to restart operations by the end of this year.

The US$10 billion LNG plant, which shipped its first cargo in June of 2013, was shut down in April last year after a major rupture on a flare line.

“ Work is still underway. The overall plan is to have Angola LNG restart with LNG to the tank in the fourth quarter of this year, probably late in the fourth quarter this year ,” Patricia Yarrington, VP and CFO of Chevron told the company’s first quarter earnings conference call on Friday.

According to Yarrington, Chevron expects Angola LNG to be operating at 75% of capacity by the first quarter of 2016.

“T he plant will run for a period of time and then ALNG will make a decision as to whether or not they need to take the plant down to perform any sort of shutdown, strainer removal, that kind of cleanup activity ,” she said.

“ In any case, we would expect ALNG to reach maximum capacity in the second quarter of 2016, if they decide to do those strainer removals ,” Yarrington added.

Angola LNG is a joint venture between Sonangol (22.8%), Chevron (36.4%), BP (13.6%), Eni (13.6%), and Total (13.6%).

The LNG plant, located in Soyo, is a single-train facility able to produce 5.2 million tonnes per year.

Angola LNG also has a dedicated fleet of seven vessels that carry the chilled gas.

[mappress mapid=”17226″]

LNG World News Staff; Image: Bechtel

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free