Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Damen Multi Cat for Green Marine’s Wave and Tidal Ops
Subsea

May 19, 2015 · about 11 years ago

Damen Multi Cat for Green Marine’s Wave and Tidal Ops

Green Marine Energy Support Services, based in Orkney, recently took delivery of a Damen Multi Cat 2712 workboat for its offshore wave and tidal activities. The vessel’s first job was laying the moorings for and towing Green Marine’s heavy-lifting barge and the removal of the HS1000 tidal turbine fo

2 minutes read
  • LinkedIn
  • X
  • Email

Green Marine Energy Support Services, based in Orkney, recently took delivery of a Damen Multi Cat 2712 workboat for its offshore wave and tidal activities.

The vessel’s first job was laying the moorings for and towing Green Marine’s heavy-lifting barge and the removal of the HS1000 tidal turbine for Andritz Hydro Hammerfest.

With a length of 27.7 metres and a beam of 12.45 metres, the Multi Cat 2712 workboat, which was christened Green Isle, is a standard design with several modifications, i.e. a customised mooring system and Green Marine’s own winches, which were installed by Damen and commissioned on board.

The vessel has a speed of 10 knots, complies with the MCA CAT 1 workboat code and has a maximum bollard pull of 34.8 tonnes (average 33 tonnes). The workboat’s basic functions for Green Marine will be anchor handling, installing wave and tidal energy devices, assisting barge operations, dredger service, supply, towing, hose handling and survey. For propulsion it is fitted with two Caterpillar C32 TTA ACERT engines with a total power of 1,790 bkW at 1,800 rpm, informed Damen.

Jason Schofield , Managing Director of Green Marine, said: “Damen’s short delivery time – just over one month – was crucial to us. The order was placed on 16 March and we were able to take delivery of the workboat on 22 April, so we could start our job for Andritz Hydro Hammerfest straight away. Also, Damen’s solid reputation in the industry and the fact that the vessel has a high residual value and good fuel efficiency, made us opt for Damen. There’s been an excellent relationship with mutual trust between all parties. Future cooperation between Green Marine and Damen Shipyards is more than likely.”

[mappress mapid=”11917″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free